Manufacturer : Panel Bender    Press Brakes             Sales Contact : JACK HE              Tel :  +86-135-1658-9668            Email to : heweisheng@ragoscnc.com

PROVIDE CUSTOM EDITING

Punching machine maintenance of common sense

by:Ragos     2021-06-24
一个。 Each a quarterly maintenance shall implement the project of use: 1. Lubrication oil gushes oil amount and pressure detector function test and adjustment. 2. Air system of the filter, oil feeder adjustment valve functions such as impurities and moisture test inspection and necessary adjustments. 3. Air pressure switch setting inspection and pressure detector function test and adjustment. 4. Die height adjustment device of the sprocket, chain, transmission shaft, worm gear and worm other components such as presence of loose, abnormal and chain tension test and adjustment. 5. Gear box cover down, and the internal parts of the wear and the status of the keys you loose examination, lubricant oil, noise, vibration test. 6. Each part of the transmission system on oil gushes oil test and adjustment. 7. Brake mechanism from the piston movement, the brake Angle, and the brake clearance to land abrasion value test tally with the necessary adjustments. 8. Sliding fast clearance measurement and friction of guide rail and guide road surface check, calibration adjusted when necessary. 9. Flywheel bearing add manual lubricating grease and pipeline, such as joint inspection. 10. Balance the status and the oil cylinder oil lubrication system, such as joint test. 11. Motor circuit and electric circuit of the insulation resistance test operation. 12. The machine precision ( Perpendicularity, parallelism, integrated clearance, etc. ) Test, if necessary, adjust the correction. 13. Punching machine and accessories of the clean appearance, sort and mechanical foot ( Basis) Lock of tightening screws, nuts and level adjustment if necessary. 14. Lubricating oil system of pu, pipeline valves and other cleaning and maintenance and inspection. 15. Air system of pneumatic components, cleaning and maintenance and testing of action such as pipeline inspection. B。 Every use half a year maintenance shall implement the project. Photoelectric safety device performance test and projection Angle and regional test. 2. Another piece of electric system appearance, contact abrasion tally with loose wires, etc. 3. Overload protection device of the oil cleaning, oil chamber cleaning, oil change new pressure action and functional testing and adjusting. 4. Main motor V belt abrasion and tension condition check, adjustment. 5. From the dismantling (brake mechanism parts The flywheel excluding) Cleaning and maintenance, check clearance adjustment and refitted debugging. 6. Balancer dismantling, the other parts cleaning and inspection and refitted C. Every use maintenance shall implement the project of 1 a year. Ball tooth, connecting rod dismantling, cleaning and maintenance, check the tooth saws and connecting rod thread occlusion and abrasion, and polishing, polishing occlusal surface and apply grease. 2. Slider assembly ( The high pressure oil chamber, and cover. Overload oil cylinder, worm gear, worm, etc. ) Dismantling, cleaning and maintenance, clearance adjustment and wearing surface, oil seal check and to apply grease.
Custom message
Chat Online
Chat Online
Leave Your Message inputting...
business@ragoscnc.com